Monitoring of UAE Exchange Metro Station | United Arab Emirates

Project summary

Service provided:  Supply, installation and commissioning of instrumentation and monitoring activities
Location:  Dubai, United Arab Emirates
See google map
Client:  Hills & Fort
Period of the service:  2020
Duration of service:  3 months

Images of the project

Improvement Works for Sheikh Zayed Road (SZR)

In addition to Sheikh Zayed Road extension works, diverting utilities such as potable water is required.
Hills & Fort was contracted to excavate a shored trench, up to 5m deep, below Sheikh Zayed Road, in the vicinity of the existing UAE Exchange Metro Station in Dubai.

 

Sixense was entrusted as a 3rd-Party Consultant to undertake vibration, settlement, and groundwater table monitoring around the edge of the shored wall. The collected data enabled the real assessment of the effects of the proposed construction activities on RTA Metro Station.

 

Required Instrumentation and Monitoring Activities

 

Instrumentation and monitoring of key parameters prior, during and following the completion of the activity are recommended to ensure the stability of the trench and provide an early warning system, if need be.

 

  • Hills & Fort subcontracted Sixense as a 3 Party Consultant to undertake vibration, settlement and groundwater table (GWT) monitoring around the edge of the shored wall.
    Ground vibration levels were recorded in real-time.
  • Levelling points and optical targets were installed on the curbstone in the vicinity of the metro station.
  • Standpipe piezometer was installed to record the GWT.
  • Campaigns of semi-automatic monitoring activities were carried out.

 

The collected data enabled to assess realistically the interaction effects of the proposed construction activities on RTA facilities (Metro Station).

Project Key figures

20 Optical targets
13 Settlement markets
1 Vibration Monitoring Unit
1 Standpipe piezometer